Used to patch small cracks and breaks or spot level concrete and masonry surfaces such as basement walls patios steps sidewalks and driveways.
Dap ready mix concrete patch drying time.
Ready to use formula dries to a hard durable finish for repairing holes cracks and breaks in concrete and masonry surfaces.
If you wish to paint the patched areas may be painted with a quality latex paint after 2 to 4 hours or alkyd paint after 24 hours if desired.
Patched areas may be painted with a quality latex pain.
Ready mixed concrete patch helps repair holes cracks and other imperfections in concrete or masonry surfaces.
Speaking of water dap has water resistance over time so that it is suitable for the humid and rainy climate as well as outdoor projects.
Dap pre mixed concrete patch does not require the application of paint.
Ideal for basement walls patios steps sidewalks and driveways.
I am involved with a large urban concrete project where concrete delivery is sometimes delayed by traffic congestion.
What is the significance of this 90 minute spec.
A ready to use mixture ideal for patching small cracks and breaks or to spot level concrete and masonry surfaces such as basement walls patios steps sidewalks and driveways.
28 days preferably primed with a exterior latex primer.
For extra adhesion in heavy traffic area prime area to be patched.
Consistency paste vehicle latex emulsion solid content 83 1 application temperature temperatures greater than 40 f drying time allow to dry 24 hours before driving over patched area.
It is a pre mixed concrete patch that enables you to deal with small to large holes just after filling and scraping the rest wait for 24 hours to harden then wash it with water.
Pre mixed concrete patch prep pressure wash area step 1 grab a trowel and lay it down step 2 smooth to edges with a trowel step 3 feather applica.
Dap ready mixed concrete patch is an acrylic latex water based formula as such the sole drying mechanism is the evaporation of water.
Ready mixed concrete patch best for.
Patched areas may be painted with a quality latex paint after 2 to 4 hours or alkyd paint after 24 hours if desired.
Dry time can be significantly impacted by cool or humid application conditions moisture in the application surfaces or by thick deep applications of the product.